A | 97565 | 165 | Produce Environmental Compliance Documentation | Provide Environmental Compliance Documentation | Environmental Compliance complete | $1,000 | 1.06% | 03/01/2012 | 02/28/2013 |
B | 97566 | 66 | Trap/Collect/Hold/Transport Fish - Hatchery | Collect Pacific Lamprey for radio and PIT tagging | NMFS will assist the CTUIR with this work element. The scope of this work will be to monitor the movement of Pacific lamprey in the Umatilla River during the spawning migration. To do this we must collect lamprey for a radio and PIT tagging experiment.
BPA has provided Environmental Compliance clearance for this lamprey collection to the co-sponsor, Confederated Tribes of the Umatilla Indian Reservation, under contract #50224, work element H. NOAA and CTUIR work together on this task. | $12,000 | 12.67% | 03/01/2012 | 09/29/2012 |
C | 98816 | 158 | Mark/Tag Animals | Collect and tag lamprey juveniles | Existing full-duplex passive integrated transponder (FDX-PIT) antennas can be used to assess emigration rates and timing of lamprey macrophthalmia and ammocoetes. In addition, this equipment can provide data on entrainment of lamprey juveniles at irrigation diversions. To obtain these results it will be necessary to FX-PIT tag juvenile lamprey upstream from detectors. | $34,189 | 36.11% | 04/01/2012 | 11/25/2012 |
D | 97567 | 159 | Transfer/Consolidate Regionally Standardized Data | Upload and process radio telemetry and PIT data | NMFS will assist the CTUIR with this work element. Radio and PIT- tagged adult Pacific lamprey will be relocated via mobile tracking by the CTUIR and with an array of fixed-site receiver stations positioned along the Umatilla River. Receiving stations will have a scanning receiver and a half-duplex PIT antenna to accept data on lamprey position. To access this information data must be downloaded by the CTUIR on a regular basis and transmitted to NMFS for processing and storage in an existing database.. | $6,000 | 6.34% | 03/01/2012 | 09/29/2012 |
E | 97568 | 160 | Create/Manage/Maintain Database | Create/Manage/Maintain lamprey database | The radiotelemetry and PIT database will be developed to house downloaded data from fixed site receivers and mobile tracking data. The database will be designed to provide site names and locations (provided by CTUIR biologists) and link them with chronologies of individual fish movements (based on tagging data provided by CTUIR biologists). The database will be queried periodically to retrieve data and compile tracking histories for each tagged fish. | $10,000 | 10.56% | 04/01/2012 | 12/02/2012 |
F | 97569 | 186 | Operate and Maintain Habitat/Passage/Structure | Maintain and monitor lamprey passage structures | Lamprey passage structures have been developed for Three Mile Falls Dam, Feed Irrigation Diversion, and Dillon Diversion dams to promote lamprey passage. For this work element, each structure will be regularly visited to insure that all systems are functioning properly. In addition, a remotely-accessed video link will be established at each site to allow monitoring of lamprey passage and for periodic checks of the structure. Data will be downloaded from the HD-PIT monitoring stations and video observations of lamprey passage events throughout the migration season will be summarized. | $12,000 | 12.67% | 03/01/2012 | 12/29/2012 |
G | 97570 | 119 | Manage and Administer Projects | Project Management for lamprey project | Covers work by the contractor to manage on the ground efforts. Also covers administrative work in support of on the ground efforts and in support of BPA's programmatic requirements such as metric reporting, financial reporting (e.g., accruals), and development of a SOW package (includes draft SOW, budget, and property inventory). | $3,000 | 3.17% | 09/01/2012 | 12/01/2012 |
H | 97571 | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period Oct 2010 to Sep 2011 | NOAA's annual reporting responsibility is to provide information for the combined CTUIR-NOAA report to CTUIR. The CTUIR has responsibility to submit the report to BPA via Pisces.
The progress report summarizes the project goal, objectives, hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or level of effort for contract implementation, including any ramping up or ramping down of contract components or of the project as a whole.
Progress reports must conform to BPA guidelines. See the "formatting guidelines" link at the Technical Reports and Publications page: https://www.cbfish.org/Help.mvc/GuidanceDocuments. | $15,000 | 15.84% | 03/01/2012 | 04/15/2012 |
I | 97564 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $1,500 | 1.58% | 07/01/2012 | 02/28/2013 |